Small-batch production cost calculator

Plan batch and unit costs using your material, assembly, testing, rework and setup assumptions. Compare production quantities with a clear breakdown.

Your cost assumptions

The starting values are illustrative examples. Replace them with your own estimates; these are not Haksi prices.

Enter person-minutes per unit: add together the time each operator spends on it. For rework, use the extra person-minutes per affected unit. Count only operator time for testing; unattended test time is not labor. Use a fully burdened hourly labor cost, including employer costs and allocated overhead, or the applicable supplier rate. Avoid adding costs already included in that rate again elsewhere.

All amounts exclude VAT and other taxes. Changing currency only changes the label; it does not convert values.

Estimated batch cost

€4,100.00

Cost per unit: €41.00

Assembly, testing and rework hours: 26.67

These hours exclude setup and engineering, whose costs are entered separately.

Cost breakdown

CostBatch totalPer unit
Components and materials€2,000.00€20.00
Assembly labor€1,000.00€10.00
Testing labor€500.00€5.00
Expected rework labor€100.00€1.00
Other variable costs€0.00€0.00
Setup and one-time engineering€500.00€5.00

Calculations keep full precision; money is displayed to two decimals. Independently rounded breakdown rows may differ from the displayed total by a cent.

Compare batch quantities

Batch quantity (units)Batch totalPer unit
50€2,300.00€46.00
250€9,500.00€38.00
1,000€36,500.00€36.50

Each row is an alternative standalone batch. Unit prices, labor times, rework rate and the full one-time cost are held constant. Supplier discounts, capacity changes and repeated batches are not modeled.

Method and assumptions

Batch cost = quantity × [materials/unit + (assembly min + testing min + rework % ÷ 100 × rework min) × hourly rate ÷ 60 + other costs/unit] + one-time cost. Cost/unit = batch cost ÷ quantity.

Rework is the expected extra labor on the entered percentage of units. Every unit is assumed to be delivered; scrap, replacement parts and repeat rework are not included. Add estimated overhead, freight, packaging or other costs to the relevant inputs.

This is a planning estimate based on your assumptions, not a supplier quotation. All calculations happen in your browser.

Method reference: The Open University — fixed and variable costs

Reference check: 1,800 units × 80 variable cost + 100,000 fixed cost = 244,000 total, or 135.56 per unit after rounding.

Your inputs stay in your browser. Nothing is sent to Haksi unless you choose to submit an enquiry.

Help with a hardware project

Haksi works on electronics, firmware and manufacturing. Tell us what you are building and where you need help.

Contact Haksi

You can review and edit the message before sending it.